Christchurch Airport Control Tower
Repair of earthquake damage to Airport Control Tower – including crack mapping, injection and colour blending to both external and internal concrete panels.
Hawkins Construction contracted United Scaffolding Group to design and erect the scaffolding structure for Airways NZ.
A challenging design and delivery of scaffold which had to make allowances for non-uniform geometries of both the cone shaped tower and metal swirl artwork feature.
United Scaffolding Group’s team delivered within budget and on time, with no safety issues during the erection, modification or dismantling of the scaffolding.